RACI for small teams

RACI is a simple way to agree who does what in a project. For each task, one person is Responsible for doing it, one is Accountable for signing it off, a few are Consulted before it is done and others are Informed as it moves. It suits small teams where everyone wears several hats and work tends to fall between chairs; this guide gives a worked example for six people and a template you can copy.

Updated · 6 min read

What the four roles mean

RACI comes from project management, but nothing about it needs a project office. It is a table: tasks down the side, people across the top, and a letter in each cell where a person has a part.

The difference between C and I matters most in practice. Consulted people can slow a task down, because the work waits for their answer; Informed people never should. Keep both lists short.

  • Responsible (R): does the work. Usually one person; two at most for a shared task.
  • Accountable (A): owns the result and says when it is done. Exactly one person per task, someone with the authority to decide.
  • Consulted (C): asked for their view before or during the work, because they know something or will be affected. A two-way conversation.
  • Informed (I): told when the task starts, finishes or changes. A one-way message; they do not need to reply.

Why small teams need it

In a team of five or ten, everyone knows everyone, so roles are rarely written down. That works until it does not: two people prepare the same proposal, nobody orders the supplies because each thought the other would, or the owner ends up approving every small decision because no one else knows they may.

Writing a RACI takes about half an hour for a project and saves the conversations that start with “I thought you were doing that.” It also helps when someone is away: the Accountable person knows what is open, and the Informed people know where things stand without asking.

  • Fewer tasks done twice, or not at all.
  • The owner stops being the bottleneck for every decision.
  • New staff see quickly who to ask about what.
  • Meetings get shorter, because each task has one person who answers for it.

A worked example for a six-person team

An IT support company of six decides to launch a yearly maintenance package for its existing clients. The team is Aline (managing director), Grace (sales lead), Eric (operations), Sam (finance), Nadia (marketing) and Joel (support); the names are invented. Here is their RACI matrix, one line per task:

  • Set the price and terms of the package. R: Sam. A: Aline. C: Grace, Eric. I: Nadia, Joel.
  • Write the package description and the contract. R: Grace. A: Aline. C: Sam, Eric. I: Joel.
  • Prepare the checklist technicians follow on each visit. R: Eric. A: Eric. C: Joel. I: Grace.
  • Announce the package to clients by email and SMS. R: Nadia. A: Grace. C: Joel. I: Aline, Sam, Eric.
  • Call the 20 largest clients. R: Grace. A: Aline. C: Eric. I: Sam.
  • Set up billing for each client who signs. R: Sam. A: Sam. C: Grace. I: Eric.
  • Answer client questions in the first month. R: Joel. A: Grace. C: Eric. I: Nadia.

How to check a RACI

Read the matrix twice: once across each row, once down each person’s column.

In the example, every row has exactly one A, and Aline is accountable for three tasks only, the ones that commit the company: the price, the contract and the calls to the largest clients. Eric and Sam are both R and A on tasks inside their own field, which is normal in a small team. Joel is consulted or informed on almost everything before the launch, and rightly so, because he will answer the questions afterwards.

  • Each row has exactly one A.
  • Each row has at least one R.
  • No row has more than two or three C, or the task will wait.
  • No one has more R than they can finish in the time given.
  • Someone with many A is a bottleneck: hand some on.
  • Someone with no letter at all may not need to be on the project.

Common mistakes

Most RACI problems come from the same few habits:

  • Two Accountables. When two people own a result, neither does. Pick one.
  • Consulting everyone. Each C adds a wait. Ask the people whose knowledge changes the work, and inform the rest.
  • An A without authority. If the Accountable person cannot approve the spending or the decision, the task stalls at the end.
  • An R without time. Writing someone’s name down does not free their week. Check their other work first.
  • Making it once and filing it away. A RACI in a forgotten file stops being true within weeks. Keep it where the work is.
  • Using it for everything. Small routine tasks do not need four roles. Save RACI for work that crosses people or needs a sign-off.
  • Using it to blame. It makes work clear before it starts; it is not for finding fault afterwards.

A RACI template you can copy

Copy these lines into a document, a spreadsheet or the description of a project, and fill them in. In a spreadsheet, put tasks in rows, people in columns and the letters in the cells.

  • Project: its name, the result in one sentence, and the finish date.
  • People: everyone who may have a part, with their role in a word or two.
  • Task: start with a verb (“Set the price”, “Call the 20 largest clients”).
  • R: who does it (one name, two at most).
  • A: who signs it off (always one name).
  • C: who must be asked first, and about what.
  • I: who must be told, and when (at the start, when done, or when it changes).
  • Checks: one A per row, at least one R per row, no one overloaded.
  • Review: the date you will look at it again.

Running RACI on a task board

A RACI works best when it is not a separate document at all, but part of each task. On a task board, the Responsible person is the one the card is assigned to, the Accountable person is the one who approves it as done, and the Consulted and Informed people hear about changes. When a card is blocked, the Consulted people should hear first, because they can often unblock it.

Kasitoma’s Work module does this on every task. Each task has one Responsible (the person it is assigned to) and one Accountable, and you can add people as Consulted and Informed. Consulted people are told when the task is blocked; Informed people when it is started, done or commented on. Tasks can wait for other tasks, so the board shows what is held up and by what.

Whatever tool you use, look at the board together once a week for ten minutes: what is blocked, what is late, and whether any A or R needs to change.

Questions people ask

Can the same person be Responsible and Accountable?

Yes. On small tasks inside one person’s field, it is normal for them to do the work and sign it off. Make sure someone else is at least Informed, so the result is seen.

What is the difference between Consulted and Informed?

Consulted people are asked before or during the work, and their answer can change it: a two-way exchange. Informed people are told what happened: one way. If you do not need someone’s answer, they are Informed.

How many people should be Consulted on a task?

As few as possible, usually one or two. Each person consulted adds a wait. If a task has four or more, split it or move some of them to Informed.

Do we need a RACI for every task?

No. Use it for projects and tasks that involve several people or need a sign-off. Routine work that one person does alone needs only an owner and a due date.

Let your AI agent do the work

Start a free trial in a minute, connect Claude or ChatGPT, and hand it your sales, billing and admin today.

No card needed · works on any phone